Our utility experts can conduct Distribution Impact Study (DIS) and Distribution Asset Study (DAS) for Embedded Generators (Conventional and VRE). The DIS refers to a set of technical studies which are used to assess the possible effects of a proposed expansion, reinforcement, or modification of the distribution system or a user development and to evaluate significant incidents. The DAS is performed to determine all required distribution assets and costs necessary to accommodate the proposed interconnection of an Embedded Generators (EG) to a distribution system.
TRAINING PROGRAM
The following list of training program aims to educate employees and help companies build a culture that will